Monday, September 22, 2008
September 21
The basement is coming along. We've passed all of our inspections since the first plumbing one that resulted in "disaster". We're now at the drywall phase. There is only one section left to drywall - two sheets and it'll be done. The bathroom has been mudded, taped, and primed. The rest of the space is in the mudding phase. Here is a shot from the back corner (outside the bedroom where the evil Circuit Breaker Box is) toward the stairs.
Subscribe to:
Post Comments (Atom)
1 comment:
Looking good! It's such a mess, isn't it? All that dust just flies everywhere. Can't wait to see it when it's done.
Post a Comment